Wyeth Pharmaceutical Substation

Holt served as the General Contractor for the extension of an existing live substation inside one of the largest Pharmaceutical firms of its time.

Located on the Pfizer (Wyeth) campus, this highly secure area required significant additions to the infrastructure and foundation for circuit switches, transformers and bus bars. The Power Distribution Systems (Substation, MCC, Panelboard, UPS) were also included as part of the substation extension.

Holt installed new conduits encased in concrete along with extending the existing grounding grid. The entire site was restored and a new stone pavement was installed.

Value

$1,100,000

Architect

Wyeth Engineering

Size

25,000 Square Feet

Location

Pearl River, NY

Similar Projects

Downtime cannot be an option when it comes to maintaining a fully operational data center, evermore so during renovations and constructions of these mission critical facilities.

Brookfield Properties Fuel Tank Replacement

Brookfield Properties Fuel Tank Replacement

LaGuardia East End Substation

LaGuardia East End Substation

Wyeth Pharmaceutical Substation

Wyeth Pharmaceutical Substation