ConEdison at 4 Irving Place

Window Project | $19M | 90-day duration
Replacement of exterior windows for the entire building on floors two through twenty-six. Over 2,000 windows including asbestos abatement of the existing windows.

 

16th & 17th Floor Renovation | $20M | 12-month duration
Complete renovation of the 16th floor and half of the 17th floor for the executive offices of Con Edison. Extensive millwork and HVAC package for the 68,000 SF space including a grand staircase between floors and Multiple corporate conference rooms.

 

19th Floor Renovation | $8M | 12-month duration
3-phase renovation including asbestos abatement totaling 40,000 SF.  Renovations for the Auditorium, cafeteria, historic Pine & Edison rooms, legal offices, and construction department offices.

 

14th Floor Renovation | $16M | 5-month duration
Complete renovation of the floor totaling 48,000 SF of high-end finishes to realize ConEd’s vision for a new office concept. Renovations included extensive MEP & AV packages­, all fast-track construction delivery.

 

18th Floor Renovation | $14M | 9-month duration
Complete renovation of 48,000 SF of office space with asbestos abatement to realize an open-concept office design with meeting rooms and perimeter offices for ConEd’s legal department.

CLIENT

ConEdison

LOCATION

New York, NY

PROJECT ROLE

GC

SF

204,000