East Box Fit-out, Terminal 4

Queens, NY

Holt Construction partnered with the client to complete the Terminal 4 East Box Fit-out at JFK International Airport.

The 40,000 sq. ft. fit-out included concrete work including roof guardrails and steel supports. New granite floors were installed in addition to ceramic tile flooring and walls. New doors with frames and additional hardware was installed, while existing columns were covered and trespa panels. On the storefront itself, new roll up doors, glass and entryway was constructed along with new bollards. The space now connects to the existing baggage area and the existing entry way for the terminal.

Project Role
General Contractor

Architect
Gensler

Contract Value
$15M

Size
40,000 sq. ft.