The client selected Holt Construction to manage the multi-phased relocation of its Hangar two at LGA Airport, totaling 28,000 sq. ft.
Holt utilized innovative and sustainable concepts throughout the duration of the project which included, food waste-to-energy conversions, Combined Heat and Power (CHP), and lastly ENVAC systems and waste water recycling measures. Direct air-side access for outbound traffic was required.