This fast track project included new/upgraded power lines along with new ceilings inside the station.
The Holt team utilized specific logistical planning collaborating with the buildings and the client to work around planned construction to not disturb operations of the facility with most work commencing off hours to prevent delays. Temporary walls and signage were put into place to mitigate safety and security to employees, passengers and the general public along with protected pathways for passengers to follow. In order to enforce safety and security measures, Holt assigned a safety officer for weekly inspections. As this was also a secure work area, special care was taken to prevent equipment lose with specialized tool inventory procedures.