Holt Construction partnered with the hospital as construction manager to complete multiple lab spaces.
The general scope of work included the installation of three cardiovascular lab suites with cardiovascular lab three, created from an existing patient observation area. Included with the new cardiovascular suites, was a control room, mechanical room, and a UPS room. Labs one and two were existing suites that were renovated with new finishes and equipment.
The multiple labs required major demolition of existing patient observation areas, including demolition to ceilings and corridor areas. In order to complete the demolition, level four ICRA requirements were put into place at all times, with full containment, negative air and ICRA barriers. Safety was paramount during construction as work was directly above and below the hospital’s Emergency Room and Operating Room.
Project Role
Construction Manager
Contract Value
$2.7M
Size
2,000 sq. ft.