Medical Center Cath Lab

Pompton Plains, NJ

Holt Construction partnered with the client as construction manager to complete the Cath lab renovations to the medical center.

The medical center expanded their existing Cardiac Catheterization department by installing new equipment to provide a second procedure room as part of its Cardiology Diagnostic Services at the hospital. The original Cath Lab had reached maximum capacity and the addition of a new state of the art room with associated expansion of the pre/post area allowed for efficient patient throughput and continued growth in the service. The Catheterization Laboratory is an examination room with diagnostic imaging equipment used to visualize the arteries of the heart and the chambers of the heart and treat any stenosis or abnormality found.

Project Role
Construction Manager

Contract Value
$2.8M

Size
1,000 sq. ft.

Explore Similar Projects

Medical Center Cath Lab

Linear Accelerator

Out Patient Behavioral Health Fit-Out

ICU, Newton Medical Center