The medical center hired Holt Construction to replace the aging, motors with high efficiency inverter duty motors, installation of VFDs and motors on supply fans and replacing existing motor.

In addition Holt installed differential pressure (DP) sensors on all lines associated with pumps and static pressure sensor on all lines associated with fans, connected the sensors and VFDs to BMS for automated control, installed missing insulation on the hot water and chilled water pipes in the MERs and provided lighting controls as noted on the line-by-line and the floor plans.