Holt Construction partnered with the client as construction manager to renovate their office.
The scope of the work included the demolition of an existing 30,000 sq. ft. office floor, removal of all electrical/MEP/office fronts and ceilings, and removal of the existing staircase. Additionally, Holt furnished and installed structural steel and concrete to close opening from the previous tenant. Holt repaired all missing fireproofing on the deck, cleared the floor to base substate and performed a level grid across the existing concrete floor. All demising walls were stripped, all existing convectors were brought back to the raw steel and new FA devices and temp sprinkler loop were installed.