Holt Construction was selected for the construction of this fast-track, design-build project for the client to align with the new brand standards.
The Club’s construction took place during normal hours which was phased to minimize impact to the airport. This required close coordination with operations and was modified as needed. Due to the projects close proximity to the TSA and PANY/NJ along with other tenants; special care was taken when delivering crews and equipment to the site.