Holt Construction partnered with the client, for the outlet’s renovation program, consisting of multiple demolitions and ground-up construction to revitalize and bring an updated look to the massive shopping center.
The project consisted of six buildings from 2018 through 2022, including multiple stores and restrooms. Due to the growth of the center, specific clients required additional space, in addition to upgrading the aging buildings façade, roofs and general infrastructure. Starting in early 2018, Holt began demolition to the buildings.
Due to the general length of the project, the site continued to operate during construction. Holt’s safety team worked with the client and the various building tenants to safely operate and protect tenants, staff and shoppers during the project’s lifetime. Each site utilized yodock barriers, black scrim, in addition to material provided by the client. Twenty-foot-high temporary walls were built to block the construction site and noise all together.
Due to the close proximity to other stores, Holt worked with the other tenants on deliveries, and to mitigate high noise and dust during those clients’ peak hours. Holt held weekly meetings with sub-contractors and owners to coordinate all deliveries off hours so not to disrupt daily activities. To accelerate the schedule the buildings were demolished and constructed simultaneously.
Project Role
Construction Manager
Contract Value
$19.1M Total
Size
14,600 sq. ft. Total