Holt Construction served as construction manager for a signage enhancement project at a Dallas airport facility on behalf of the City of Dallas.
The project involved the installation of large-scale monument and pylon directional signs across various roadway-adjacent locations. The scope also included the removal of an existing art sculpture to prepare for foundation work at the monument site. Given the active public environment, safety fencing was installed during foundation excavation to keep pedestrians and vehicles out of the work zones. Crane operations required careful coordination with the FAA to avoid disruption to nearby air traffic. All signage structures were custom-fabricated and featured integrated lighting for improved visibility and wayfinding.
Project Role
Construction Manager
Contract Value
$1.2M
Size
2,000 sq. ft.