Holt Construction provided general contracting services for the construction of a spa at Terminal 4 at the John F. Kennedy Airport.
The spa is a fully operational upscale health and wellness center with access to on-site care with medical professionals, Covid-19, rapid PCR tests, IV drip infusion therapy, flu shots, and on-site virtual sessions like yoga and fitness. The completed space features custom fabricated acoustical pocket doors, acoustical plaster ceilings, Italian tile and a high end sound and lighting system throughout the space, custom built glass and tile storefront, wellness rooms featuring interactive visual mirror displays, shower/restroom suite with high end tile and cast concrete sink.