Terminal 8 TAA Parcel

Queens, NY

The client contracted Holt Construction to construct and modify multiple gates on Concourse B and Concourse C so they are capable of utilizing the 777-200 and the 777-300 aircraft.

A paved portion of the ramp was constructed for RON stand utilization with the gates receiving a 60’ bump out of Concourse B to accommodate an expanded hold room. A 30’ bump out was added to support expanded BHS and international arrivals claim devices.

Project Role
Construction Manager at Risk

Architect
AECOM

Contract Value
$14.4M

Size
41,000 sq. ft.