Vertical Lift Modules

Houston, TX

This project allows for the installation of additional Vertical Lift Modules at the client’s existing Storage Building B.

The scope of work included, but is not limited to: Saw cutting and reinforced concrete slab replacement at the new VLM in addition to the construction of a new UPS room and new UPS System. A new HVAC system located near in the UPS Room was installed in addition to new storage fencing to match the existing.

Project Role
General Contractor

Contract Value
$790K

Size
15,000 sq. ft.