This project allows for the installation of additional Vertical Lift Modules at the client’s existing Storage Building B.
The scope of work included, but is not limited to: Saw cutting and reinforced concrete slab replacement at the new VLM in addition to the construction of a new UPS room and new UPS System. A new HVAC system located near in the UPS Room was installed in addition to new storage fencing to match the existing.